There are about 11 steps to the pool construction phase. There
are also several inspections throughout the process. On average
construction time is 3 to 6 weeks from the time we start to dig the
pool till the final inspection is completed on your pool. We make
sure to make the construction proceedure as pleasant as possible
and clean up after every day of work.
Step #1: LAYOUT, DIG AND STEEL THE POOL
First we lay the pool out with stakes with you to make sure the
pool is to your liking. This is where changes can be made to the
design. Once the desired shape and location are approved, we
finish the layout with more stakes and 2’x4’s. Next we start digging
the pool stacking the dirt up around the pool perimeter. Once the
digging is complete, we steel the pool with rebar 1 ft on center.
Then we install the main drains and light niche and any plumbing
that needs to be done before gunite.
Step #2: GUNITE SHELL IS INSTALLED
Gunite is a sprayed on application that is hand carved to your
pool specs. You will then be able to see what your pool will look
like at this stage.
Step #3: DIRT REMOVAL
We haul the dirt away from the job and remove all the forms that
we installed to form up the pool shell.
Step #4: PLUMBING
We install all the jets and plumbing for the pool and equipment.
The plumbing will be pressure tested at this stage to check for
any leaks.
Step #5: TILE
We install all the waterline tile to the pool shell wall.
Why Choose East Coast Pools & Spas?
East Coast Pools & Spas is your source for custom pool and spa
installation as well as repair in Ormond Beach, FL, Daytona Beach, FL
and surrounding areas. With over 14 years experience, we provide
award winning designs and professional construction with the owner,
Tom Gilbert, on every job. As a family-owned business Mr. Gilbert puts
the family name on the line on every pool installation.
Step #6: DECKING
We layout the pool deck whether it is concrete , pavers or
travertine. If it is concrete it will be textured after the pool deck is
poured. If it is pavers or travertine we will have to bring in road
base and pack it with a compactor. Then the pavers will be
installed.
Step #7: ELECTRIC
A licensed electrician will install all the wiring for the pool
equipment from your breaker panel.
Step #8: SCEEN ENCLOSURE
If you have chose to screen your pool area, it will be installed at
this time.
Step #9: PLASTER / POOL SURFACE
We clean out the pool and set up any mosaic tiles at this time.
Then the plaster pool surface (Diamond Brite or Pebble Tech) is
installed by hand. The pool will begin to fill at this time.
Step #10: FINAL GRADE
Final clean up is done at this time and grading of your yard to
remove any ruts we may have made during construction.
Step #11: POOL SCHOOL
We show you how to operate, and use your pool equipment , test
your water, and vacuum your pool. Now you can enjoy your
backyard oasis.